Light Gauge Steel – Cyclone Strong


There is a reason steel frames are emerging as the way of the future for the construction industry. The rigidity, strength and customisation of steel frames have made them the material of choice for all framing needs.

The below images show the impact caused by Tropical cyclone Ilsa, when winds of 288km/h ripped through the Pardoo Roadhouse in Western Australia. Fortunately the frames were left standing. This demonstrates how durable a light gauge steel frame is. If this building had been constructed out of timber frames, you can almost guarantee there would be nothing left standing. Causing the rebuild process to cost more than it would if you use light gauge steel frames.

Damage to the Pardoo roadhouse after cyclone Ilsa tore through WA.

Benefits to using light gauge steel:

  • Disaster resistant – Your building will remain a quality piece of architecture even through the toughest natural elements. Steel is completely non-combustible material, so your frames won’t burn, char or contribute to the spread of a fire. It’s also coated in a zinc-aluminium alloy to resist rusting. After a bush fire, steel frames can be the difference between fixing your building or having to rebuild entirely.
  • Unlike timber, steel frames are 100% termite proof. No termite treatment or ongoing maintenance required.
  • Engineered light gauge steel will not rot, warp, twist, bow or shrink over time, so your frame will always look as good as the day it was installed.
  • Steel is the environmental building choice. It’s completely recyclable, although this is rarely required given its infinite lifespan

Why choose Dynamic Steel Frame?

A Dynamic Steel Frame’s wall frame is durable, accurate and incredibly strong. In fact, our TRUECORE® steel features one of the highest strength to weight ratios of any conventional building product. Plus, it comes with a 50 year corrosion warranty from BlueScope Steel*.

 We combine superior design, engineering software and automated roll formers to produce steel framing with the strength and performance which is unmatched by conventional wood framing systems.

Over time, your building retains the same superb quality it was delivered with, eliminating upkeep and maintenance costs. What’s more, large span of LGS allows for greater creative freedom when designing your building, compared to timber.

So when your looking for high quality light gauge steel frames for your next build. Call the team to discuss.

Phone: 03 9701 7342
Email: sales@dynamicsteelframe.com.au

Nuville Court, Mt Eliza

Dynamic Steel Frame detailed and manufactured the frames for this recent project at Nuville Court, Mt Eliza.

This residential build showcases the beauty and ease of using light gauge steel frames.

DSF’s detailer Michael, worked closely with the client. Ensuring communication was maintained throughout the project to establish the best outcome on site.

Nuville Court showcases Dynamic Steel Frame’s residential steel frame service. Producing a precise, durable and robust metal house frame from the ground up.

Below both the client and detailer speak on their overall views of the project. From their favourite aspects of the project, to the hurdles they faced during the design process and how they were able to overcome these.


Detailer Notes:

What is your favourite design feature?

My favorite design feature is the cathedral / rafter roof which was designed to blend in through the split-level roof lines which once finished, will look amazing.

Michael – Detailer

What did you enjoy about detailing this project?

I really enjoyed detailing this job. Designing the cathedral roof, attics in roof space and figuring out wall height’s due to the split levels. Peter made the process of this job easy. With every bump we came across, we sat down and fixed it. It always comes with great pleasure to help our clients build their dream home for their family.

Michael – Detailer

Were there any difficulties that you came across during the detailing process? How did you overcome this?

The most difficult design aspect to this project was the roof over the stair area. I worked alongside our engineer, trying to tie this in to match the roof lines and coming up with a solution that would not only give the client (Peter) what he really wanted from this area but put a huge smile on his face with how amazing it looked in the 3D model.

Michael – Detailer

How did you manage client expectations?

Communication. Communication was a big part to this job as it is in every job we take on. I thank Peter, for not only understanding the prosses, but understanding when things had to be altered. And because of this we were able to achieved every expectation of his dream home.

Michael – Detailer
Nuville Court, Mt Eliza



Client Notes:

How was DSF able to meet the architectural intent of your design?

DSF took on the challenge to build my multi split level house, they were confident they could achieve this build with minimal Structural Steel which they did. The design has extensive cathedral and pitched rafter roofs which were required to blend in through the split level roof lines which they got perfect. Another great feature they were able to complete upon request was extensive attic space within the truss’s to house the projects mechanical system and gain further storage space.   

Peter – Owner builder

Were there any issues that arose during the detailing process? How was DSF able to overcome this?

During the detailing process we became aware of multiple design ceiling height issues, DSF managed to work through these with their engineer to ensure the final product was what we wanted. Further to this, the detailer worked hand in hand with us to make sure all the finer details worked such as inwall toilet systems, vanity mirror nooks, studs correctly aligned for plumbing fixtures, stud setouts for weatherboards taken into consideration, this list could go on.

Peter – Owner builder

Was DSF able to meet your project’s timeframe?

From detailing through to production and final delivery, DSF hit all timelines promised. I was extremely impressed on how well the final delivery process went. We worked together to split the project up into separate delivery bundles that worked for the stages I wanted installed onsite. With deliveries coming on time, it made for a smooth process, allowing us to utilize the delivery crane to get these in the most beneficial location.   

Peter – Owner builder

Why did you choose to use light gauge steel framing for this project?

Lighter. Straighter. Better… Long term, maintenance free house.

Peter – Owner builder

A home built from a Dynamic Steel Frame represents the future of house framing. Over time, your house retains the same superb quality it was delivered with, reducing upkeep and maintenance costs.


If you are looking to use light gauge steel framing made from TRUECORE® steel for your next project, contact the team at sales@dynamicsteelframe.com.au to get your project underway.

Watch as this project takes shape from start to the final stages of framing. Encapsulating the beauty of a TRUECORE® steel house frame.

151 Chapel Road

151 Chapel Road Keysborough consists of 56 townhouses and approximately 250,000 lineal meters of TRUECORE® light gauge steel framing.

Dynamic Steel Frame has been working on this recently completed townhouse development for a year now.

Our detailer Dai worked closely with the client to ensure the best outcome for this project. Below he speaks on some key points from this project.

Are there any houses that stood out to you? What is your favourite design features?

Type F – unit 56 is a unique design. This particular type was one that was not repeated across the project. It’s got the largest amount of steelwork and the most complicated hip roof design compared to the rest. Saddle trusses were used to achieve the architectural intent, as well as making for easy installation onsite.

Dai – Detailer

What was your favourite and least favourite part of the design?

The design of a hip roof is always challenging. This can either be the most or lest favourite part of any design. It was a very challenging aspect of this project, but it was very satisfying to see it work so well onsite, once completed.

Dai – Detailer

How did you manage the potential material delays and client expectations?

We work very closely with our client’s in every project. However in a large townhouse project like this one it is essential! I had efficient discussions with the client’s draftsperson on the design intent which helped to minimise unnecessary rectification of frames onsite. Communication with the site manager assisted with anticipating the production workload along with site demand. With this we managed to deliver frames within the clients requested schedule.”

Dai- Detailer

Drone view of 151 chapel road keysborough site. Progress flight 3.

Check out the below video’s of 151 chapel road and the progress of this site from flight one to flight six.

Flight 1 – Check out this 56 townhouse development in Keysborough. Using approx. 250,000 lineal meters of Truecore Steel.
Lighter. Straighter. Better.
Second flight of this 56 townhouse development in Keysborough. Using approx. 250,000 lineal meters of Truecore Steel.
Lighter. Straighter. Better. Best.
Flight number three of this 56 townhouse development. Check out the progress that has been made! Lighter. Straighter. Better.
Flight number four of this 56 townhouse development. Check out the progress that has been made!
Lighter. Straighter. Better..
Flight number five of this 56 townhouse development. Check out the progress that has been made! This site is now nearing completion.
Lighter. Straighter. Better.
Sixth and final flight of this 56 townhouse development. Check out the progress that has been made! This site’s framing is now completed. Lighter. Straighter. Better.


Light Gauge Steel Framing

Dynamic Steel Frame uses the most advanced light gauge steel framing system available in the world today. Combining design and engineering software with an automated rollformer to produce wall frames, roof trusses, floor joists and panels quickly and accurately. With our extensive experience and unmatched knowledge base we offer innovative solutions to your challenges.

Light gauge steel frame townhouses, at our McCormick Rise project, in Cranbourne West

Why light gauge steel framing?

Steel frames represent the future of house framing.

  • Unlike timber, metal house frames are 100% termite PROOF. You’ll never splash a single dollar on termite treatment or ongoing maintenance.
  • A steel framed house offers added fire protection to your building through its 100% non-combustible composition. After a bush fire, steel framing can mean the difference between fixing your home or having to rebuild entirely.
  • Durability – TRUECORE® light gauge steel floor joist have a high resistance to deterioration. They will never rot, warp, shrink or sag.
  • Steel is the environmental building choice. It’s completely recyclable, although this is rarely a concern given its virtually infinite lifespan.
  • Lightweight – the metal’s lightweight formula makes it a dream to transport and install. Weighing almost half that of timber, steel trusses can be lifted into place using a single hand.

Why Dynamic Steel Frame?

With Dynamic Steel Frame, you can rest assure you’re receiving the most advanced steel framing system available in the world today.

  • A comprehensive steel service offering optimised for all segments of the building industry – from tiny scale residential to large scale commercial.
  • Strength and performance engineered into every frame. Our advanced combination of design and engineering software and an automated roll formers produce frames, trusses and joists quickly and accurately.
  • Industry leading, highly experienced team of qualified experts who can provide you with innovative solutions to your challenges.
  • We aren’t afraid to push the bounds of conventional builds, offering you the freedom to achieve a design free from constraints.
  • A cost effective, environmentally friendly building choice that comes with a 50 year warranty provided by TRUECORE® steel.

If you want to use TRUECORE® steel for your next project, contact the team at sales@dynamicsteelframe.com.au to get your project underway.

Overlay of one of our Sketchfab models on the final build. Shows that our 3D models are digital twins of what to be expected on site. Reducing on-site errors.
Overlay of one of our Sketchfab models on the final build.

“Turning architectural intent and into reality!”

– Peter Blythe, Managing Director

That’s a wrap 2022



As the year nears it’s end and we prepare for the year ahead, let’s take a look back at some of the highlights of 2022 for Dynamic Steel Frame.

Dynamic Steel Frame 2022 Highlights



Over this past year we have completed many projects from large townhouse developments through to single residential dwellings. Each project being unique and different to the last.

Highlights - Check out our video from St Georges terrace, Fitzroy
St Georges Terrace, Fitzroy



This year we completed 4 large Townhouse developments working with SAW Constructions.

These projects included:

Highlights - Aerial view of the 40 townhouse development at McCormick Rise, Cranbourne West.
McCormick Rise, Cranbourne West.

In June, we partnered with Skysight to film our updated company video, in celebration of DSF turning 10!

Dynamic Steel Frame – Company Profile Video 22



Dynamic Steel Frame’s managing director Peter Blythe also returned to Australia’s favourite renovation show this year. Helping the Blockheads frame their new pavilions with TRUECORE Steel and COLORBOND Steel. Bringing the vision to life of Julian Brenchley (The Block architect).

Pushing the boundaries of height and spans, DSF was able to produce a great rendition of structural intent versus architectural intent.

“Every year when Dynamic Steel Frame completes The Block, we are left with a great sense of pride and achievement”

Peter Blythe, Managing Director

It was a pleasure working with everyone involved with this years production!

Highlights - Peter Blythe, Managing Director at Dynamic Steel Frame on site at The Block.
The Block 2022

Finally we have ended our year as winners, accepting the award for ‘Innovative cold formed steel buildings’ at the recent Australian Steel Excellence Awards Gala in Sydney for our Grattan street façade project.

This project embodies everything light gauge steel has to offer! A huge congratulations to all who were apart of this project.

Highlights - Peter Blythe, Managing Director at Dynamic Steel Frame with John Shayler, National President, NASH.
Peter Blythe, Managing Director at Dynamic Steel Frame with John Shayler, National President, NASH

The team at Dynamic Steel Frame would like to thank all of our clients, friends and supporters for yet another fantastic year. We look forward to what this new year of 2023 has install for us all!

Australian Steel Excellence Awards 2022


Dynamic Steel Frame are proud to announce we are the winners of the ‘Most Innovative Cold Formed Steel Building’ at the ASI Excellence Awards 2022! with our Grattan street façade project.

We loved how the building sloped back from the street to enable light to get to the playground below and the way that the light gauge steel framing was able to faithfully produce the architectural intent.

The challenge we had was enabling the facade to rake back from the street, whilst being accurate and also allowing for deflection in the slab across seven different levels of the building.

Our detailer Brandan Verzantvoort spent a lot of time on this project, ensuring that everything was as per design.

Light gauge steel worked incredibly well and was critical to the success of this project. With our automated roll formers and very high-tech design software we were able scallop the floor joist style members over the edge of the slab both top and bottom then insert bracketry exactly where required. This ensured that onsite it was a simple process of bolting on the brackets and then bolting the brackets to the frames.

Winning this award make us very proud!

This project embodies everything light gauge steel has to offer!

Award - Winner, innovative cold form steel building. 2022 Victoria steel excellence awards

Project Team

Developer: Little Projects
Architect: Plus Architecture
Steel Fabricator: Dynamic Steel Frame
Façade Engineer: Inhabit Group
Structural Engineer: Structerre Consulting
Builder: Cobild Construction & Bolt Blue Constructions
Steel Supplier: Truecore Steel

Location: Prahran, Victoria

https://www.steel.org.au/asi-awards-portal/award-winners-2022/

209 Chapel Road, Keysborough

Dynamic Steel Frame has been working to produce these wonderful townhouses in keysborough for a year now.

This project used approximately 155,000 lineal meters of Truecore Steel.

These frames have gone up exceptionally fast, and the townhouses are now on their way to completion.

Also check out these frames leaving our factory on their way for delivery to 209 Chapel Road, Keysborough !!

Tiny House Delivery

Dynamic Steel Frame take on tiny house delivery.

Last year the team at Dynamic Steel Frame took a journey from Dandenong to Williamstown to deliver these 3 tiny houses for Treehab.

Watch as team DSF take the roads of Melbourne to make this delivery.

Lighter. Straighter. Better. Tiny Delivery

Everlea Keysborough

Check out the Everlea Keysborough project from above!

This is Victoria’s largest light gauge steel frame townhouse site to date.

A huge 116 Townhouses using approx. 400,000 lineal meters of Truecore Steel.

Lighter. Straighter. Better. Best.

Tiny House Assembly

Who doesn’t love a tiny house!

Here is a time lapse of three Tiny Houses we assembled in one day.

Take a look into how quickly a tiny house frame made with Truecore steel can be erected.

Lighter. Straighter. Better. Tiny.